TMMC
Full-solution elevator modernization

Your elevator is aging.
Your building doesn't have to show it.

We modernize elevators with certified parts and expert installation teams — minimizing downtime, maximizing reliability, from assessment through commissioning.

500+
Elevators modernized
Commercial & residential, region-wide
15+
Years of experience
Specialist in legacy controllers
98%
Client satisfaction
Across 4-year survey window
72hr
Average response
From first call to site visit
National Energy Efficiency Programme

Elevator modernization is now part of national building-renovation funding.

Under Bulgaria's second National Energy Efficiency Programme, the elevators in multi-family blocks being renovated are now included — repaired where they can be, replaced where they are no longer safe, and newly installed in buildings that never had one.

Assessed before renovation

Each elevator's technical condition and energy-efficiency class are evaluated before the building's renovation begins.

Repaired or replaced

Sound systems are repaired with energy-saving mechanisms and photovoltaic-ready power; the oldest, unsafe cabins are replaced with new ones.

Funded through the programme

Integrated into the renovation programme — easing the cost for condominiums and energy-poor households.

Per Bulgaria's Ministry of Regional Development and Public Works (MRRB).

Why modernize now

Aging elevators are a hidden liability. Modernization turns that liability into an asset.

Minimal disruption

Schedules built around your building. Phased installs keep at least one car running where possible.

Certified parts

Only OEM-certified controllers, cabling, and cab components from leading manufacturers.

Compliance & safety

Brought up to current code with documentation your insurer and inspector will accept.

Modernize, don't replace

Often 40–60% the cost of full replacement, with comparable lifespan and performance.

Our process

A direct path from "it's breaking down again" to "it runs like new."

Step 01

Free Assessment

Site visit, system evaluation, clear findings. No obligation, no jargon.

Step 02

Tailored Proposal

Detailed plan with timeline, cost, and certified parts spec — written for owners, not engineers.

Step 03

Professional Installation

Experienced teams, coordinated around your building's schedule and tenants.

What we modernize

Every system that shapes ride quality, safety, and energy use.

A modernization is modular. We replace what your building needs — controller to cab — and certify the rest.

01 Control system
02 Drive & machine
03 Door operator
04 Fixtures & COP
05 Cab interior
06 Safety systems
01 02 03 04 05 06
01
Control system

Microprocessor controller with destination dispatch logic, fault logging, and secure remote diagnostics.

Remote diagnostics Fault logging
02
Drive & machine

Gearless permanent-magnet traction machine with regenerative braking and variable-voltage control.

−40% energy −12 dB noise
03
Door operator

Closed-loop door operator — smoother, faster, and far fewer reopen faults across daily cycles.

2.4s cycle −90% faults
04
Fixtures & COP

New car operating panel, position indicators, and ADA-compliant tactile hall and car fixtures.

ADA-compliant Tactile buttons
05
Cab interior

Refreshed finishes, LED lighting, ventilation, and code-compliant handrails sized to your traffic.

LED lighting Code-compliant
06
Safety systems

Overspeed governor, safety gear, and buffers inspected and upgraded to current safety code.

Overspeed governor Current code
— Certified Manufacturer Partners —
All work backed by original-manufacturer warranties. Logos are placeholders — replace with licensed partner marks.
Selected case studies

Buildings that traded constant breakdowns for quiet, compliant rides.

Before / After
Manhattan, NY

Pre-war residential, 14 floors — controller and cab refresh

6-week install Otis controller
Before / After
Hoboken, NJ

Mixed-use commercial, 22 floors — full modernization, twin cars

10-week install Schindler
Before / After
Brooklyn, NY

Hospital wing, traction system — non-stop staged replacement

12-week install KONE
What building managers say

The compliment we hear most: "we forgot the elevator was there."

We had an elevator that broke down twice a month for two years. TMMC did the assessment, gave us a straight number, and finished a week ahead of schedule. Tenants stopped emailing me.
SL
Sarah Lieberman
Facilities Director · 14-floor mixed-use, Brooklyn
They explained the controller swap in plain English to our board. That alone was worth it. The work itself was the calmest construction project we have ever run.
MR
Mark Renteria
Property Manager · Pre-war residential, Manhattan

Ready to find out what your elevator actually needs?

We will visit on a schedule that suits the building, evaluate the system top to bottom, and send you a written assessment with a clear, no-pressure recommendation.

+359 88 941 1264
Contact us

Talk to a modernization consultant.

Call or email — we respond within 72 hours, with no obligation.